VALERO-Flare

VALERO entrusted QUALIFAB with the assembly of Flare sections and associated piping. This included three 8-foot sections with a 54-inch diameter.  

Suncor

SUNCOR requested the construction of a coil and the fabrication of a heat exchanger box. This project included welding at considerable heights.  

NORTH ATLANTIC

The NORTH ATLANTIC project included the fabrication of piping (Crude section 130 c/w snubber). The challenges of this project were the fast-track delivery and handling of pressure vessel components.  

LINDE / ÉNERGIR

On behalf of LINDE and ENERGIR, QUALIFAB is manufacturing and assembling 6 LNG modules. This project includes the structure, piping, pressure vessels, instrumentation, electricity and insulation. It should be noted that each module weighs 60,000 pounds and is over thirty feet long, and that trial adjustments had to be made in the workshop using cranes. […]

AIREX/IOC – AIR MAKE-UP SYSTEM

In order to continue fighting climate change and reduce greenhouse gas emissions, AIREX/IOC hired QUALIFAB to manufacture and install a glycol heating skid.