HYDRO-QUÉBEC requested that several different sections (12 kV) be dismantled. This large-scale work involved restricted spaces and the management of large quantities of contaminated soil. This project, consisting of switchgear and control work, required advanced expertise in civil engineering and architecture to ensure that all structures and the existing substation were dismantled.